            Pre-Certified = Faster – How KRECO Helped a Ventilator Maker Save Lives in a Crisis

            The pandemic hit.

            A Swedish ventilator manufacturer needed to ramp up production urgently.

            Their bottleneck wasn't assembly.

            It was power supply certification.

            Every new power supply design requires 4 to 6 months of medical safety testing. In a global health emergency, that timeline is a luxury no one can afford.


                        PRE-CERTIFIED = FASTER  KRECO

            The KRECO Solution

            We offered a pre-certified medical power platform.

            The IEC 60601-1 CB report had already been issued. No waiting. No redesign.

            All they needed was integration testing — verifying that the certified power module worked correctly with their specific ventilator electronics.

            The Result

            Integration testing completed in just 6 weeks.

            5,000 ventilators shipped ahead of schedule.

            In a crisis, every week counts. By eliminating the certification bottleneck, KRECO helped put life-saving equipment into hospitals faster.

            Pre-certified platforms save lives.

            When speed matters, don't start from scratch. Start from pre-certified.

            Choose KRECO. Where readiness meets urgency.