The pandemic hit.
A Swedish ventilator manufacturer needed to ramp up production urgently.
Their bottleneck wasn't assembly.
It was power supply certification.
Every new power supply design requires 4 to 6 months of medical safety testing. In a global health emergency, that timeline is a luxury no one can afford.

We offered a pre-certified medical power platform.
The IEC 60601-1 CB report had already been issued. No waiting. No redesign.
All they needed was integration testing — verifying that the certified power module worked correctly with their specific ventilator electronics.
Integration testing completed in just 6 weeks.
5,000 ventilators shipped ahead of schedule.
In a crisis, every week counts. By eliminating the certification bottleneck, KRECO helped put life-saving equipment into hospitals faster.
When speed matters, don't start from scratch. Start from pre-certified.
Choose KRECO. Where readiness meets urgency.