Wrong PSU, Lost Lock
Why LEO terminal power systems demand precision engineering
A LEO terminal looks simple outside. But if the power system is wrong, you lose lock, lose data, and send technicians to a mountain or a ship.
Signal loss. Data interruption. Costly field repairs. Real consequences of an underspecified PSU.

Three precision steps from KRECO's StarNet team
Profile real power, not nameplate
Give us steady wattage for RF, phased array, BUC/LNB, baseband, and antenna heater — plus inrush and peak duty. We add 30% headroom and specify hold-up time so a brief grid dip never reboots the modem.
Match the site conditions
Outdoor units need wide temperature range, IP rating, surge and vibration immunity. Phased-array references run DC 24V from −20°C to +65°C, low-temperature builds to −40°C. We then map CE, UL, FCC, PSE, KC, or CCC to your target market and satellite-communication EMC limits.
Build for 24/7 and remote health
100% full-load burn-in, batch traceability, over-voltage, over-current, short-circuit, and over-temperature protection. For critical nodes: N+1 redundancy and PMBus reporting of voltage, current, temperature, and fault history.
Protection layers built in
-
Over-voltage
-
Over-current
-
Short-circuit
-
Over-temperature
-
N+1 redundancy
-
PMBus monitoring
−40°C to +65°C
wide temperature
30% headroom
+ hold-up time
100% burn-in
+ batch traceability
Send us: terminal type · peak wattage · operating temperature · IP requirement · target countries
Receive a certified, derated, redundant-ready power BOM within two working days.
Wrong PSU, lost lock — get it right with KRECO StarNet.